Selected reference projects
REALISATIONS: bike industry

2015. Four-pillar vertical conveyor
2015. Four-pillar vertical conveyor

A system of two four-pillar vertical conveyors installed in a manufacturing company in 2015. The system is responsible for transporting non-standard pallets in the warehouse from the ground floor to the second storey on a warehouse platform where the goods are stored after production.

2015. Transport system for containers
2015. Transport system for containers

This is another of our container handling projects. We completed it in 2015. This interesting system was delivered to a production company and is shown in selected pictures. We used various equipment such as roller and belt conveyors, transfers and dynamic scales.

2016. Pallet transport system with a vertical conveyor
2016. Pallet transport system with a vertical conveyor

A system to transport wooden 1400x1400mm pallets of a standard euro pallet design on which bicycles are placed. The system was equipped with the following equipment: roller pallet conveyors and vertical conveyors with an in-built roller conveyor.